Moorhusen railway overpass
Moorhusen, Germany
Start of construction:
May 2024
Construction volume (value of our services):
170.000 EUR
BBV Systems supports the construction of the new railroad overpass in Moorhusen.
Elbebrücke, A 14, Wittenberge
Wittenberge, Germany
Start of construction:
February 2024
Construction volume (value of our services):
2,9 M EUR
The project consists of the road bridge over the river Elbe, which is built as part of the new construction of the A14 Magdeburg – Schwerin motorway, located south of the city Wittenberge.
PWZ Proben- und Werkstättenzentrum
München, Germany
Start of construction:
December 2023
Construction volume (value of our services):
125.000 EUR
BBV Systems is adding its expertise to this joint project involving many Implenia units.
STEP (Sation d’épuration) Mamer
Mamer, Luxembourg
Start of construction:
September 2021
Construction volume (value of our services):
250.000 EUR
BBV Systems supports the extension of the Mamer sewage treatment plant with the installation of tendons.
Yusufeli Bridge
Yusufeli, Türkiye
Start of construction: January 2021
In northeastern Turkey, on the road between Yusufeli and Bayburt, the Nurol-Gülsan consortium is building the Yusufeli bridge.
Tiefgarage Luitpoldplatz Bayreuth
Bayreuth, Germany
Start of construction: September 2020
Renovation of the underground car park.
Klosterwall Hamburg
Hamburg, Germany
Start of construction: January 2020
New construction of a quarter in the "Kontorhausviertel".
2nd Niger River Brücke
zw. Anambra State und Delta State, Nigeria, Nigeria
Start of construction: January 2019
The 2nd Niger River Bridge in southern Nigeria consists of a 1.6 km long prestressed concrete superstructure, which is built using the incremental launching method, cantilevered cantilever construction and on falsework. …
Zuidelijke Ringweg, Groningen
Groningen, Netherlands
Start of construction: January 2019
The southern bypass of the Dutch city of Groningen is about twelve kilometers long. The contract for the expansion of the southern ring road was awarded to the consortium Combinatie Herepoort.
Vorlandbrücke Neckartalübergang, BAB A6 bei Heilbronn
Heilbronn, Germany
Start of construction: March 2018
The Foreland bridge will be erected as a two-legged T-beam using the advancing method. Tendons of the types BBV L22 and BBV L15 are installed here.
Pfädchensgraben viaduct, A 61
Rheinböllen, Germany
Start of construction: January 2018
The two existing superstructures of the valley bridge will be demolished and replaced by new superstructures.
Marieholmstunnel
Göteborg, Sweden
Start of construction: March 2017
To ease the traffic situation in Gothenburg, Sweden, the new Marieholmstunnel was built. It is intended to facilitate the crossing of the Göta Älv river, which runs through the city center, and to reduce congestion at the…
Überseequartier Hamburg
Hamburg, Germany
Start of construction: January 2017
Construction pit for 3 basement floors in diaphragm wall construction.
Wehrhahn-Linie, Los 1
Düsseldorf, Germany
Start of construction: July 2007
The state capital Düsseldorf is realizing the so-called core section of the Wehrhahn Line as an underground tram route to improve local public transport. With the new double-track tunnel route, which is a replacement for 5…