Tunnelling,
Excavation pits
Zuidelijke Ringweg, Groningen
semiperm, removable CR BBV-multibond® semiperm, (2-bond) removable PR BBV-multibond® semiperm, (2-bond) removable CR BBV-multibond® semiperm, (3-bond) removable PR BBV-multibond® semiperm, (3-bond) removable CR For the 3-way staggered multi-strand anchor system BBV-multibond® CR (3-bond) semi-permanent [...] length! Procedure: approx. 2500 pieces: BBV semiperm, removable PR BBV semiperm, removable CR BBV-multibond® semiperm, (2-bond) removable PR BBV-multibond® semiperm, (2-bond) removable CR BBV-multibond® semiperm, (3-bond) removable PR BBV- micropile S670 Dia75mm [...] The securing of the sheet pile shoring was planned and implemented with double and triple staggered, semi-permanent strand anchors from the BBV-multibond® system. Since almost all the multi-strand anchors have to be dismantled, the extraordinary load-bearing capacity and functionality of the following[...]