Bridges Steinavötn, Fellsa und Brunna
Short description
Longitudinal post-tensioning of the 3 road bridges Steinavötn (length 100 m), Felsa (length 47 m) and Brunna (length 24 m) with BBV L15 tendons, using plastic ducts.
The project
BBV Systems was responsible for the longitudinal post-tensioning of three new bridges in Mosfellsbaer, Iceland. The construction was carried out using the strand post-tensioning method and a plastic duct.