Lahntal Bridge Limburg, A3
Short description
Construction of a 450m long bridge.
The project
The two superstructures of the 450 m long and 62 m high Lahntal Bridge each consist of two haunched, longitudinally prestressed hollow girders that were erected in cantilevered cantilevering.
Services in detail
- 170 t external pre-tensioning
- 500 t internal pre-tensioning
- Installation, stressing and injection
Procedure:
- BBV L15
- BBV L15E