Post-tensioning system,
Bridge construction
Cautin River Bridge
In 2020, in the north of Temuco, near Cajon, the approx. 300 m long Cautin River Bridge was built, which crosses both the Cautin River and the Temuco-Santiago railway line. The 7-span prestressed concrete bridge was built by the ConPax company with single-span girders. The BBV L12 system according to ETA-05/0202 was used for prestressing steel work; the work was carried […]