Trogbauwerk Scharpitz
Short description
New construction of the transfer structure 2952-08 of the DB-AG on the island of Rügen.
The project
For the new construction of the transfer structure 2952-08 of the DB-AG on the island of Rügen, a trough excavation with approx. 1,200 m sheet pile wall was created. The sheet pile wall was secured with approx. 11,000 m BBV strand anchors.